Square drain for a concrete swimming pool

Ref. No: TRYSUMC

The square drain for a concrete swimming pool It is made from ABS and features UV protection. It has a square cover and a 2″ connection for integration into the hydraulic circuit of in-ground swimming pools. Its installation must be planned during the construction of the pool, in accordance with the position, flow rate and safety requirements specified for the installation. Current web reference: TRYSUMC.

Units per box: 1

Product information

Square drain for in-situ swimming pools

The 2″ square drain for a concrete swimming pool It is designed to be installed at the bottom of the pool during the construction or refurbishment of a concrete swimming pool. It forms part of the hydraulic circuit and can assist with drawing water from the lower areas, recirculation or draining, depending on the design specified by the professional.

Trypool confirms that the body is made of ABS and has an anti-UV coating. The website currently uses the reference TRYSUMC, whilst the catalogue identifies the square concrete drain with the code SUMC and a 2″ connection. Both codes should be checked before the product details are finalised.

Square lid

The square cover is designed to cover the access point to the drain body and must remain securely fastened whilst the swimming pool is in use.

The system must not be started up if the cover shows any of the following:

  • Breaks.
  • Deformations.
  • Missing screws.
  • Movements.
  • Clearances.
  • Damage that could affect how securely it is fixed.

Current information does not confirm that the lid has an anti-vortex design. This feature must not be included in the name, description or images without the relevant documentation.

Installation in concrete

As this is a concrete mould, the body must be positioned before the formwork is fully completed. Installation must ensure that it is correctly levelled and prevent the final finish from hindering the removal of the cover for future inspections.

Before pouring concrete or sealing off the site, the professional must check:

  1. Position of the drain.
  2. Height relative to the final finish.
  3. Connection orientation.
  4. Pipe diameter.
  5. Leak-tightness of the joints.
  6. Walk to the control room.
  7. Compatibility with other extraction points.

Hydraulic sizing

The 2″ connection must be incorporated into a correctly sized circuit. The permissible flow rate cannot be determined solely on the basis of the connection’s nominal diameter.

The pump capacity, pressure drops, pipe length, valves, elbows and the overall layout of the system must also be taken into account.

Until the technical data sheet is available, no maximum flow rate, suction speed or working pressure should be published.

Maintenance

Maintenance should include the regular removal of waste, checking the lid, checking the screws and carrying out a visual inspection of the ABS.

If a crack, deformation or leak is detected, the system must be shut down until a professional has inspected the installation. Keeping the cover clean and securely fastened helps to maintain the system’s performance and safety.

You may also be interested in

News

Featured articles to improve your pool or your customers' pool

How to choose a salt chlorinator based on the volume of your swimming pool in cubic metres

Which salt chlorinator do I need, based on the volume of my swimming pool in m³?

Cubic metres are the starting point, but they are not enough on their own. To choose the right salt chlorinator, you need to ….
Read more →

How to prime a swimming pool pump and remove air from the circuit

The pump starts up, the motor is running, but the water isn’t circulating properly. When looking through the cover of the ….
Read more →
A professional working out which heat pump a swimming pool needs

What sort of heat pump do I need for my swimming pool?

To work out what sort of heat pump a swimming pool needs, we need to know its volume in cubic metres, the temperature we want to achieve, the ...
Read more →
TRYPOOL

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.